Newly renovated Beach Pavilion opening

Wed, 06/13/2018 - 3:00pm

The Fred Benson Beach Pavilion has been renovated with a brand new blue exterior color, and will be opening full-time this Saturday, June 16 for the summer season.

The beach pavilion was renovated by Lincoln-based Mill City Construction from a design schematic drafted by Northeast Collaborative Architects. The project steward was Sam Bird, who is the Town of New Shoreham's Facilities Manager.

The music soundtrack titled "Think Big" is by Scott Holmes. Video By Cassius Shuman.

This video content is property of The Block Island Times.

Share: